BCIT

Factor Four

Reducing energy and materials use four-fold

  • Energy
    • Demand-Side Management
    • Re-Using Wasted Heat
    • On-Site Renewable Heat
    • On-Site Renewable Electricity
  • Materials
  • Restoration
    • Ecological Restoration
    • Urban Restoration
  • About Factor Four
  • Education
  • Teaching Resources
  • Contact

Passivhaus Trades training coming to Factor Four

October 29, 2015 by Alexandre Hebert Leave a Comment

As part of its Passivhaus strategy for transforming building NE1, the Factor Four team has collaborated with various internal partners and the Canadian Passivhaus Institute to offer for the first time in BC a 5-day Passivhaus Trades Training course.

The first delivery of the course will be from October 30th to November 7th.  The newly built lab mock-ups will be housed in the vicinity of the Factor Four area.

This 3-day (up to 5 days) course provides the knowledge and practical skills building contractors need to build to the world’s most efficient energy standard. This course focuses on building enclosure optimization, and provides a foundation in passive house principles, while stressing the importance of construction fundamentals and proper sequencing. Participants will learn building techniques that minimize thermal bridging, maximize airtightness, while using a variety of materials. An introduction to common passive house mechanical systems will be provided, including heat and energy recovery ventilators, heat pumps, and solar thermal.

The inaugural training was a huge success with 15 students registered. A big thank you goes to the organizers, CanPHI, the instructors and of course, the students.  Check-out some photos from the training lab:

2015 Phouse Trades K Brennan 1 2015 Phouse Trades K Brennan 4 2015 Phouse Trades K Brennan 7 2015 Phouse Trades K Brennan 12 2015 PHouse Trades Workshop_040 2015 PHouse Trades Workshop_042 2015 PHouse Trades Workshop_043 2015 PHouse Trades Workshop_052 2015 PHouse Trades Workshop_060 2015 PHouse Trades Workshop_063

More info on the lab can be found here.

 

 

 

Filed Under: Uncategorized

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Follow Us on Instagram

@bcitfactorfour
Follow Us on Instagram Instagram

Categories

  • Energy Case Studies
  • Integrated Case Studies
  • Materials Case Studies
  • Restoration Case Studies
  • Uncategorized

Search Tags

Completed Ecocity Energy Guichon Alley Guichon Creek In-progress Live Data Living Lab Materials Partnership Restoration

Copyright © 2025 · BCIT · BCIT Commons